09:54:06 From Jay Rodenbeck : DFT just went over comments on item #2, PR-2025-011387 AKA PR-2024-010189 09:54:34 From Jay Rodenbeck : The current case being discussed is item #1, PR-2025-020055 10:07:30 From Jay Rodenbeck : The current case being discussed is item #4, PR-2022-007103 10:28:26 From Anthony Montoya : Hydrology will need to approve the revised Grading & Drainage Plan (M14D038) with engineer’s stamp 03/27/2025. 10:29:01 From David Gutierrez : Conditions: separate public and private infrastructure keyed notes and verify the removed hydrant is not necessary to remain for adjacent developments and proper spacing per DPM. 10:30:49 From Jay Rodenbeck : Planning conditions of approval: 10:32:03 From Jay Rodenbeck : Correct the maximum pole height of light poles on the Site Plan per 2022 IDO requirements 10:33:05 From Jay Rodenbeck : Add the following note to the Site Plan: The contractor should be notified of the potential for landfill gases to be present during the construction of the Arno St. SE road section 10:33:19 From Jay Rodenbeck : Recorded IIA must be submitted 10:37:41 From Jay Rodenbeck : Recorded Access Easement must be submitted 10:38:14 From Jay Rodenbeck : The current case being discussed is item #5, PR-2024-009956 10:42:52 From David Gutierrez : Water Authority Conditions: 1. Provide a final recorded 10' public sanitary sewer easement. 2. Coordinate with the Water Authority to ensure there is an acceptable access to the existing public sanitary sewer manhole on site. 10:46:46 From Jay Rodenbeck : jboylan@cabq.gov 10:51:39 From Jay Rodenbeck : The current case being discussed is item #6, PR-2025-020052 10:59:48 From Antoni Montoya : antonimontoya@cabq.gov 11:05:25 From Whitney Phelan : No comments. 11:07:59 From Marcelo Ibarra-COA Planning : Marcelo Ibarra at 505-924-3987 mareloibarra@cabq.gov 11:12:37 From Marcelo Ibarra-COA Planning : Marcelo Ibarra at 505-924-3987 mareloibarra@cabq.gov