09:06:46 From Angela Gomez : The application in discussion is item #1, PR-2019-002651 09:12:27 From Jay Rodenbeck : ;6-4(N)(3) The relevant decision-making body identified in Table 6-1-1 may approve a requested deviation that is within the limits listed in Table 6-4-1 if that decisionmaking body determines that all of the following requirements are met. 6-4(N)(3)(a) The applicant’s site is subject to site constraints not generally shared by surrounding properties or the site was platted or developed in an unusual pattern when compared to abutting properties (e.g. the property was developed with orientation or access facing a different street than abutting lots) that would prevent the development of a permissive land use in a type of structure generally found on sites of a similar size in the surrounding area. 6-4(N)(3)(b) The site constraints were not created by the actions of the property owner or another interested party. 6-4(N)(3)(c) The request is for a single site and is not part of a pattern of similar requests for adjacent properties or for nearby sites by the same property owner or within the same subdivision, Fram 09:16:46 From David Gutierrez : Conditions for Water Authority: Revise notes to include the following: a. Coordination with Water Authority Cross Connection Section will be required to ensure proper backflow containment is in place prior to release of meter for the site. Contact the Cross Connection Section at 505-289-3454. b. Coordination with the Water Authority Pre-Treatment Engineer is required to ensure the site complies with Water Authority Sewer Use Ordinance. Contact the Pre-Treatment Engineer at 505-289-3439. 09:17:38 From David Gutierrez : Additionally, label infrastructure private and public as appropriate and update reference to COA standard details to Water Authority standard details and note that construction will be completed with a connection permit. 09:25:31 From Robert Webb : PER CODE ENFORCEMENT: Parking areas: Clearly show on site plan the specific areas and counts of parking spaces. The calculations are provided on the TCL, but it is not clear which spaces will be restricted to hotel parking – the number of spaces shown on the TCL greatly exceeds the numbers given in parking calculations. Clarify the location of parking spaces/area to be used. --- Light Trespass: Property is zoned NR-BP, and is located in light zone Lz1, per Table 5-8-2. This requires maximum 0.1 footcandles measured at property line, as per IDO section 5- 8(F)(4), Table 5-8-3. Photometric plan shows multiple areas along the North, West, and East property lines that are exceeding the allowed amount of light trespass at property line. --- 09:25:37 From Robert Webb : Light fixtures: It is unclear if light fixtures A1, A2, and A3 are properly angled/shielded, based on information provided. Please provide clearer light detail sheets and confirm they meet requirements as per IDO 5-8Z(E) General Design and Illumination standards. --- Located in APO Noise Contour Sub Area. Construction must meet use-specific requirements of the APO Noise Contour Sub-area 65DNL, as found in the APO Overlay Zone Table 3-3-2 and IDO 3-3(C)(2). Please add note and/or provide documentation showing these standards will be met. 09:32:55 From Robert Webb : PLANNING: Provide details for the Deviation exception request. The request must include site explanations and justification criteria. --- Clarify building/façade design and elevation requirements of 5-11-E-2-a and 5-11-E-3-a. --- Clarify pedestrian connection requirements of IDO section 5-3 and the Sunport Park Plan. --- Clarify the existing landscaping conditions between the existing development, new hotel development, and how the submitted landscaping plan meets both the Sunport park standards and the requirements of each relevant section of IDO 5-6 (Landscaping, Screening, & Buffering). --- Due to the mitigation plan requirement, Environmental Health will need to be added to the Site Plan signature block. 09:33:38 From Robert Webb : *Once approved, before a Site Plan, Plat, or Infrastructure List will be distributed for signatures, the following must be met: 1. The Site Plan and Infrastructure List to be distributed for signatures must depict any revisions required per the conditions and/or findings featured in the Notice of Decision for the application. 2. All Site Plan and Infrastructure List sheets must be included in the submittal to be distributed for signatures; no additional documents/sheets should be included in this submittal (for example, submit a comment response letter separately). 3. The Site Plan and Infrastructure List submittal to be distributed for signatures must be featured in a single PDF. 4. The Site Plan and Infrastructure List must feature/depict the project and application numbers. 09:33:52 From Robert Webb : 5. All Site Plan sheets must be stamped and signed by a design professional licensed in the State of New Mexico, with the Landscape Plan sheet(s) stamped and signed by a Landscape Architect licensed in the State of New Mexico. 6. The title of the Site Plan and Infrastructure must follow the following naming scheme: a. Site Plan: project number_application_number_Site_Plan_Approved_date of approval b. Infrastructure List: project number_application number_IL_Approved_date of approval *The final Site Plan needs to be distributed to Jay Rodenbeck at jrodenbeck@cabq.gov and Jacob Boylan at jboylan@cabq.gov for distribution for DFT signatures. 09:34:51 From Angela Gomez : The application in discussion is item #2, PR-2022-007999 09:38:30 From David Gutierrez : Water Authority Conditions: AS 251116 needs to be completed and the following notes must be addressed: a. Please clearly label existing and/or proposed infrastructure as public or private as applicable. b. Please add the following notes to the Master Utility Plan i. Coordination with Water Authority Cross Connection Section will be required to ensure proper backflow containment is in place prior to release of meter for the site. Contact the Cross Connection Section at 505-289-3454. ii. Coordination with the Water Authority Pre-Treatment Engineer is required to ensure the site complies with Water Authority Sewer Use Ordinance. Contact the Pre-Treatment Engineer at 505-289-3439. 09:41:42 From Jacob Boylan : Planning Conditions: 09:41:45 From Jacob Boylan : § Project and application numbers will need to be added to the site plan cover sheet prior to distribution for sign off. 09:43:05 From Jacob Boylan : Finding: Should Infrastructure be required per the availability statement, an Infrastructure list will need to be created and approved as well as an IIA provided prior to final sign off. 09:43:27 From Hannah Shea-Parks & Recreation : Parks & Recreation Condition of approval: LS101 and LS102 are showing wrong labels for the Hawthorn trees, calling them out as Yuccas. Please remove those 'Yucca' labels from both sheets. 09:54:06 From Bailey Thompson : Hydrology Comment for future development of site: Prior to submitting for Building Permit, a licensed New Mexico civil engineer will need to submit a Grading & Drainage Plan to Hydrology for review & approval if one of these conditions is met. (500 cy of grading, 1,000 sf of proposed building, or 10,000 sf of proposed paving). 09:55:10 From Ernest Armijo : For help with waiver and determination please contact me at earmijo@cabq.gov 09:58:45 From Jay Rodenbeck : ABQ-PLAN — City of Albuquerque 10:04:59 From Robert Webb : *For verification of building permit, trade permit, and C/O info – Building Safety - 505-924-3320, or 505-924-3860, option #1. Web page info-- https://www.cabq.gov/planning/building-safety-division https://www.cabq.gov/planning/building-safety-division/permits 10:20:15 From Antoni Montoya : antonimontoya@cabq.gov 10:24:24 From Antoni Montoya : shalley@cabq.gov 10:24:39 From Antoni Montoya : Shannon Halley