09:05:53 From Angela Gomez : The application in review is Item #1, PR-2019-002651 09:44:43 From Angela Gomez : The application in discussion is Item #2, PR-2025-020132 09:55:41 From Marcelo Ibarra-COA Planning : Prior to final approval, the applicant shall revise the lighting design and photometric plan to demonstrate compliance with the maximum allowable light trespass standard. The submitted photometric plan indicates that light trespass exceeds allowable limits at the driveway entrance. Because the site is adjacent to a residential zone, light trespass is restricted to a maximum of 0.1 footcandles at the property line. 10:04:53 From Marcelo Ibarra-COA Planning : https://documents.cabq.gov/planning/development-facilitation-team/Site_Plan_Administrative_DFT_Signature_Block.pdf 10:09:05 From Marcelo Ibarra-COA Planning : A signature block shall be added to the plan set to allow for the inclusion of the project and application numbers. 10:10:28 From Angela Gomez : The application currently in discussion is Item #3, PR-2019-003120 10:27:07 From Antoni Montoya : antonimontoya@cabq.gov 10:28:03 From Robyn : drowley@cabq.gov 10:28:16 From Robyn : Deborah Rowley, Certified Building Official 10:31:00 From Angela Gomez : The item currently in discussion is Item #4, PR-2022-007999 10:36:02 From David Gutierrez : Conditions for PR-2022-007999, SP-2025-00091: Need a completed Availability Statement (251116) and properly label all infrastructure (existing, proposed, public or private as applicable), and add the following notes to the utility plan: Coordination with Water Authority Cross Connection Section will be required to ensure proper backflow containment is in place prior to release of meter for the site. Contact the Cross Connection Section at 505-289-3454. ii. Coordination with the Water Authority Pre-Treatment Engineer is required to ensure the site complies with Water Authority Sewer Use Ordinance. Contact the Pre-Treatment Engineer at 505-289-3439. 10:37:20 From Ernest Armijo : Condition from Transportation to provide width of exiting sidewalk. 10:39:03 From Marcelo Ibarra-COA Planning : The submittal must demonstrate that the site plan meets or exceeds the minimum required parking for all proposed uses. Provide Elevations of proposed new structure with height/dimensions. Provide a lighting plan that will comply with all requirement of 5-8 of the IDO 10:48:16 From Hannah Shea-Parks & Recreation : hshea@cabq.gov 10:54:42 From Angela Gomez : The application currently in discussion is item #5, PR-2026-000031 10:56:29 From Marcelo Ibarra-COA Planning : Code Enforcement (CE) didn't provide any comments for the preceding cases 11:04:44 From Angela Gomez : DFT stands in recess until 11:15 11:25:47 From Robyn : drowley@cabq.gov 11:26:04 From Robyn : jamesaperez@cabq.gov (Building Safety Division Manager) 11:33:50 From Robyn : Fast Housing 11:34:25 From Robyn : In April of 2024, City Council passed Resolution 24-22, establishing a two-year policy for prioritizing site plan approvals and construction permitting of development projects that will result in permanent housing near Downtown, Metropolitan Redevelopment Areas, and many of the city’s centers and corridors. There will be no additional FasTrax fees required for applications processed this way. The City of Albuquerque’s Planning Department has developed this Fast Housing tool to help developers identify qualifying addresses. 11:37:16 From Jackie Fishman : whats your number 11:56:29 From Marcelo Ibarra-COA Planning : Marcelo Ibarra at 505-924-3987 marceloibarra@cabq.gov 11:58:25 From Angela Gomez : The item in discussion is Item #9, PR-2026-000035