dmdmaps.cabq.gov - /HydroTrans/1_DrainageManagementPlans-As-Builts/Final/SDC CapacityReport, Easterling 2013/Appendix B/B.5/CD_HEC_HMS Files/
[To Parent Directory]
8/14/2013 3:33 PM 313 100_yr__24_hr.control
8/14/2013 3:33 PM 5317 100_Yr__24_hr.met
8/14/2013 3:33 PM 5064 100_Yr__6_hr.met
8/16/2013 10:30 AM <dir> basinStates
8/14/2013 3:33 PM 19476 Developed_24_hr.log
8/14/2013 3:33 PM 19419 Developed_6_Hr.log
8/14/2013 3:33 PM 108846 Developed_w_Real_Tc.basin
8/14/2013 3:33 PM 332 Ex._Cond._100_yr__6_hr.control
8/14/2013 3:33 PM 19565 Exist__Real_Tc__24_hr.log
8/14/2013 3:33 PM 108614 Exist_Per_CORR_DPM.basin
8/14/2013 3:33 PM 19410 Exist_per_SSCAFCA_DPM.log
8/14/2013 3:33 PM 108803 Exist_w_Real_Tc.basin
8/14/2013 3:33 PM 19311 Exist_w_Real_Tc.log
8/14/2013 3:33 PM 19226 For_Smith_Equation_6hr__Exis.log
8/16/2013 10:30 AM <dir> optimizer
8/14/2013 3:34 PM 1284639 SDC2013.dsc
8/14/2013 3:34 PM 81789952 SDC2013.dss
8/14/2013 3:34 PM 1062 SDC2013.gage
8/14/2013 3:34 PM 1018 SDC2013.hms
8/14/2013 3:34 PM 412 SDC2013.log
8/14/2013 3:34 PM 6709 SDC2013.out
8/14/2013 3:34 PM 21626 SDC2013.pdata
8/14/2013 3:33 PM 2800 SDC2013.run
8/15/2013 4:52 PM 417433 SUB-BASINS.dxf